{"id":12075,"date":"2020-04-07T13:32:17","date_gmt":"2020-04-07T13:32:17","guid":{"rendered":"https:\/\/droghedabaltrayfrs.ie\/?page_id=12075"},"modified":"2025-07-20T16:35:50","modified_gmt":"2025-07-20T16:35:50","slug":"timeframe-2","status":"publish","type":"page","link":"https:\/\/droghedabaltrayfrs.ie\/index.php\/timeframe-2\/","title":{"rendered":"Timeframe"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"12075\" class=\"elementor elementor-12075\" data-elementor-settings=\"[]\">\n\t\t\t\t\t\t<div class=\"elementor-inner\">\n\t\t\t\t\t\t\t<div class=\"elementor-section-wrap\">\n\t\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-2cc7f1f9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"2cc7f1f9\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t\t\t<div class=\"elementor-row\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-5e8db4dd\" data-id=\"5e8db4dd\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-column-wrap elementor-element-populated\">\n\t\t\t\t\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-78f07097 elementor-widget elementor-widget-text-editor\" data-id=\"78f07097\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-text-editor elementor-clearfix\"><p><!-- wp:paragraph --><\/p>\n<p>The flood relief scheme will compromise five stages, as follows:<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><strong>Stage I: Scheme Development and Design\u00a0 <\/strong>Stage 1 will involve the collection of all relevant data related the project, a survey specification will be prepared, tendered, and managed and a hydrological and hydraulic analysis of the study area will be carried out. A full cost-benefit analysis of the project will also be undertaken during this stage.<\/p>\n<p><strong>Stage II: Planning\u00a0 <\/strong>Stage II will involve preparation of all documentation required to progress the Scheme through the necessary planning, including public display, and other statutory processes.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Stage III: Detailed Construction Design, Confirmation and Tender\u00a0 \u00a0<\/strong>Stage III will involve detailed design, preparation of tender documents and a public competition to appoint a main works contractor.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Stage IV \u2013 Construction\u00a0 <\/strong>Construction will be carried out by a works contractor, under supervision of the consultant, following a public procurement competition. A Functioning Scheme will be in place at the end of stage IV.<\/p>\n<p><strong>Stage V \u2013 Handover of Works\u00a0 <\/strong>Commission of the completion certificate. Preparation of a financial analysis report for the project. \u2018As-Built\u2019 surveys, \u2018As-Built\u2019 flood mapping and an updated Climate Change Adaption plan will be prepared.<\/p>\n<p>\u00a0<\/p>\n<p><a href=\"https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant.png\"><img loading=\"lazy\" class=\"alignnone size-large wp-image-12687\" src=\"https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-1024x232.png\" alt=\"\" width=\"1024\" height=\"232\" srcset=\"https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-1024x232.png 1024w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-300x68.png 300w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-768x174.png 768w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-768x174@2x.png 1536w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-1024x232@2x.png 2048w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-400x90@2x.png 800w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-1260x285.png 1260w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-615x139.png 615w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-400x90.png 400w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-292x66.png 292w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-300x68@2x.png 600w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-800x181@2x.png 1600w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-615x139@2x.png 1230w, https:\/\/droghedabaltrayfrs.ie\/wp-content\/uploads\/2025\/07\/drogheda-ghant-292x66@2x.png 584w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>\u00a0<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:image {\"id\":12429,\"sizeSlug\":\"large\"} --><\/p>\n<figure class=\"wp-block-image size-large\"><\/figure>\n<p><!-- \/wp:image --><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-1ad7cae elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"1ad7cae\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t\t\t<div class=\"elementor-row\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-84cb6d7\" data-id=\"84cb6d7\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-column-wrap\">\n\t\t\t\t\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The flood relief scheme will compromise five stages, as follows: Stage I: Scheme Development and Design\u00a0 Stage 1 will involve the collection of all relevant data related the project, a survey specification will be prepared, tendered, and managed and a hydrological and hydraulic analysis of the study area will be carried out. A full cost-benefit&#8230;<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/pages\/12075"}],"collection":[{"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/comments?post=12075"}],"version-history":[{"count":29,"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/pages\/12075\/revisions"}],"predecessor-version":[{"id":12688,"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/pages\/12075\/revisions\/12688"}],"wp:attachment":[{"href":"https:\/\/droghedabaltrayfrs.ie\/index.php\/wp-json\/wp\/v2\/media?parent=12075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}